AREA
REQUIREMENTS FOR LOTS WITHOUT PUBLIC UTILITIES |
AVAILABLE
PUBLIC UTILITIES |
MINIMUM
LOT AREA |
|
Neither Public Water nor
Sewer |
2 acres(1) & (2)
[1ha] (5 acres [2.25ha] in RC Districts) |
|
Public Water Only |
1.5 acres(1)
[0.75ha] (5 acres [2.25ha] in RC Districts) |
|
Public Sewer Only |
1 acre(2)
[0.5ha] (5 acres [2.25ha] in RC Districts) |
|
Both Public Water and
Public Sewer |
As required by zoning
district regulations |
| (1)Each lot
created shall include an area determined to be suitable for both a primary and reserve
on-site septic system installation, with documentation of health department approval for
each proposed location.
(2) Each
lot created shall include a suitable location for a well as determined by the health
department. Documentation must be provided. |