ARTICLE V. PUBLIC WATER CONNECTIONS AND CONNECTION FEES

Section 22-99. Connection fees established.

(a) Any person required or desiring to connect to the facilities of the county shall, unless otherwise provided in this chapter, pay the connection fees set forth in the schedule which follows as a part of this section. Such fees shall be paid at such time as required by this chapter. The connection fee to be paid shall be the indicated total initial fee or total regular fee as required. The connection fee shall not include the actual cost of connection nor payments to any water supplier other than the county, all of which shall be borne by the applicant unless otherwise specifically provided in this chapter. Existing commercial or industrial connections may upgrade the connection size by paying the initial connection fee applicable to the larger size connection. A credit will be given for connection fees previously paid. Columns entitled "Local Facility Charge" and "System Facility Charge" are used only for the purposes referred to in other sections of this chapter.

CONNECTION FEE SCHEDULE

 

METER SIZE

I. INITIAL

II. REGULAR

Local
Facility Charge

System Facility Charge

Total
Facility
Charge

Local
Facility
Charge

System
Facility Charge

Total
Facility Charge

5/8"

$1,000

$1,850

$2,850

$1,750

$3,250

$5,000

3/4"

$1,500

$2,775

$4,275

$2,625

$4,875

$7,500

1"

$2,500

$4,625

$7,125

$4,375

$8,125

$12,500

1 ½"

$5,000

$9,250

$14,250

$8,750

$16,250

$25,000

2"

$8,000

$14,800

$22,800

$13,965

$25,935

$39,900

*Larger than 2"

$50.00/GPM $92.50/GPM $142.50/GPM $87.50/GPM $162.50/GPM $250.00/GPM

*GPM per meter size as determined by AWWA Standard

(b) In addition to connection fees, service charges will be imposed by the water purveyor based on usage.

Back to Chapter Contents
Back to Code Contents
Home Page