|
ARTICLE V. PUBLIC WATER CONNECTIONS AND CONNECTION FEES
Section 22-99. Connection
fees established .
(a) Any person required or desiring to connect to the facilities of the
county shall, unless otherwise provided in this chapter, pay the connection fees set forth
in the schedule which follows as a part of this section. Such fees shall be paid at such
time as required by this chapter. The connection fee to be paid shall be the indicated
total initial fee or total regular fee as required. The connection fee shall not include
the actual cost of connection nor payments to any water supplier other than the county,
all of which shall be borne by the applicant unless otherwise specifically provided in
this chapter. Existing commercial or industrial connections may upgrade the connection
size by paying the initial connection fee applicable to the larger size connection. A
credit will be given for connection fees previously paid. Columns entitled "Local
Facility Charge" and "System Facility Charge" are used only for the
purposes referred to in other sections of this chapter.
CONNECTION FEE SCHEDULE
|
METER SIZE |
I. INITIAL |
II. REGULAR |
Local
Facility Charge |
System
Facility Charge |
Total
Facility
Charge |
Local
Facility
Charge |
System
Facility Charge |
Total
Facility Charge |
5/8" |
$1,000 |
$1,850 |
$2,850 |
$1,750 |
$3,250 |
$5,000 |
3/4" |
$1,500 |
$2,775 |
$4,275 |
$2,625 |
$4,875 |
$7,500 |
1" |
$2,500 |
$4,625 |
$7,125 |
$4,375 |
$8,125 |
$12,500 |
1
½" |
$5,000 |
$9,250 |
$14,250 |
$8,750 |
$16,250 |
$25,000 |
2" |
$8,000 |
$14,800 |
$22,800 |
$13,965 |
$25,935 |
$39,900 |
*Larger
than 2" |
$50.00/GPM |
$92.50/GPM |
$142.50/GPM |
$87.50/GPM |
$162.50/GPM |
$250.00/GPM |
*GPM per meter size as determined by
AWWA Standard
(b) In addition to connection fees,
service charges will be imposed by the water purveyor based on usage. |