Sec. 22-36. Point of connection determined; moving of meter or service.

The connection point with the facilities of the county shall be at the water service connection provided by the county. In the event the property owner wishes to change the location of the water service connection, the full cost of providing a second point of connection shall be borne by the owner. The work shall be done by the County or its agent and the cost of such work shall be charged to the owner at actual cost plus ten percent (10%).