ARTICLE VI. DESIGN STANDARDS

DIVISION 1. GENERAL LAYOUT AND DESIGN

Sec. 20.5-74. Sewer.

Requirements and standards for sewage disposal in subdivisions are as follows:

(a) Public sewer. If public sewer is available in accordance with other provisions of the Code (whether or not separated from the subject property by a hard surfaced road), it shall be extended to all lots within the subdivision including recreation areas where, because of their size and configuration, construction of facilities requiring connection to sewer is anticipated, but not remnants unsuited for building.

(b) Individual sewer.

     (1) If public sewer is not available, subdivisions with lots served by septic systems may be approved by the agent provided that the following documented proof of each of the following is submitted:

           a. Both a primary location and a one hundred percent (100%) reserve location for the septic system will be provided, neither of which shall be located, in whole or in part, in the resource protection area;

          b. The location and design for each septic system (both primary and reserve) has been accomplished in accordance with the most cur-rent edition of the "Sewage Handling and Disposal Regulations" of the Virginia Department of Health and all applicable provisions of this Code and has been specifically and individually approved by the health department;

         c. Contamination or pollution of wells, groundwater, state waters, reservoirs, or any Chesapeake Bay resource preservation area or resource management area is unlikely to occur from any proposed individual septic system.

      (2) Any such subdivision submitted for review shall include the specific locations proposed for both primary and reserve on-site septic system installations with documentation of health department approval for each proposed location. Any proposed lots not suitable for the installation of private sewage disposal systems shall either be combined with lots that are suitable or dedicated to common open space or recreation use, so that only buildable lots are created.

(c) Construction standards.

All sewage disposal systems shall be constructed in accordance with all applicable construction standards contained in this Code and policies adopted by the county pursuant thereto. A construction permit shall be is-sued by the county administrator prior to the commencement of construction.

(d) Off-Site sewer facilities costs.

Where sewer facilities and improvements located outside the limits of the project are required to be constructed, the subdivider shall be eligible for such credits or cost sharing arrangements as are stipulated in this Code.

(Ord. No. 05-33, 12/20/05)

Back to Chapter Contents
Back to Code Contents
Home Page