(1) Prohibit the discharge of such
wastewater.
(2) Require a discharger to
demonstrate to the satisfaction of the county administrator that "in plant"
modifications will reduce or eliminate the discharge of such substances in conformity with
this chapter.
(3) Require pretreatment, including
storage, facilities, or flow equalization necessary to reduce or eliminate the
objectionable characteristics or substances so that the discharge will not violate this
chapter. In cases where it is agreed that any waste will be accepted into the facilities
of the county after receiving preliminary treatment, drawings and specifications showing
all pertinent details of the methods and construction proposed to accomplish the
preliminary treatment shall be submitted to the county administrator for approval. Where
preliminary treatment facilities are utilized prior to discharge to county facilities,
they shall be subject to periodic inspection by the county administrator and shall be
maintained in good operating condition. Access shall be provided for flow measurements and
sampling waste before they reach the facilities of the county. Provisions shall be made to
control the rate of discharge and to shut off completely the discharge from pretreatment
facilities if required.
(4) Take such other remedial action
as may be deemed desirable or necessary to achieve the purpose of this chapter.